Contact | Help | Links
home
 
I-74 Iowa-Illinois Corridor Study

The I-74 Iowa-Illinois Corridor Study is examining a range of solutions, developing a recommended plan to improve traffic flow and mobility along the Interstate 74 corridor, and providing a functional and aesthetically pleasing bridge improvement across the Mississippi River. The project is a joint effort of the Iowa Department of Transportation and Illinois Department of Transportation, in cooperation with other agencies and officials.

The Purpose of the I-74 Project is to:
  • Improve Safety (to Reduce Crashes)
  • Update Corridor Design and Improve Condition
  • Improve Traffic Flow
  • Improve Dependability of Travel (Travel Time, and Average Speed Through Corridor)
  • Improve Opportunities for Other Modes of Transportation
  • Enhance Opportunities for Economic Development

Project Implementation Process

I-74 Iowa-Illinois Corridor Study home page

Environment Impact Study: I-74 Iowa-Illinois Corridor

Frequently Asked Questions (FAQ)

I-74-Map-North.pdf (344.0 KB)
I-74 Re-alignment Map_North
I-74-Map-Central-South.pdf (554.5 KB)
I-74 Re-alignment Map_Central-South
i74-mrc-bro.pdf (679.4 KB)
Download the I-74 Mississippi River Crossings Brochure

Media
video3
Title: #5 - The I-74 Journey
Copyright: Iowa D.O.T.
Date: N/A
Time Duration: 15:08
Select Speed High | Low

For more information about this project, please contact:
Cathy Cutler
Iowa DOT
District 6 Office
430 16th Avenue, SW
Cedar Rapids, IA 52406
Catherine.Cutler@dot.state.ia.us
1.800.866.4368 or 319.364.0235

Feature Section

Related Information
Copyright © 2003-2009 | Version 2.5 | Equal Opportunity Employer
This Page Last Revised:
Thursday, November 29, 2007