Mississippi River (Iowa / Illinois)
Bridge Location Restriction Timeline Status
I-74
Mississippi River (Iowa / Illinois)
Patching of roadway at approaches to bridge in Bettendorf. Nighttime lane restrictions, only between 7:00 p.m. and 6:00 a.m.

March 2009

 

Resurfacing (Iowa), Nighttime lane restriction, only between 7:00 p.m. and 6:00 a.m.
May 2009 March 31st, 2009 letting
Bridge washing. Nighttime lane restrictions, only between 8:00 p.m. and 6:00 a.m., to be announced.
April 2009  
Annual Bridge Maintenance and Inspection Activities. Intermittent non-peak daytime lane closures., to be announced
Throughout Year 2009  
Bridge Painting, I-74 approach structures (Iowa), No lane closures on I-74 are anticipated
Summer 2009 March 31st, 2009 letting
Overhead bridge replacement at Lincoln Road, Bettendorf. Nighttime lane restrictions, only between 7:00 p.m. and 6:00 a.m., to be announced.
March through December 2009  
Structure repair and resurface I-74 from 7th Avenue to Rock River, South of IL-5, restricted to one lane in each direction from June to ovember 2009.
Summer-Fall 2009 April 3rd letting

Lighting system modernization at approaches to bridge. Intermittent lane closures on I-74 in Moline.

May-June 2009  
I-80
Mississippi River (Iowa / Illinois)
Bridge washing one week. Intermittent non-peak hour lane closures.

June or July 2009  

Reconstruction from Mississippi River bridge to I-88 (Illinois). One lane in each direction with head-tohead traffic with crossover. In 2nd year, two lanes of traffic in each direction on alternative side of interstate.

May-November
2009 and 2010
 
I-280
Mississippi River (Iowa / Illinois)
Bridge washing one week. Intermittent non-peak hour lane closures.
June or July 2009  

Patching (Iowa). Nighttime lane restrictions, only between 7:00 p.m. and 6:00 a.m.

April 2009  
U.S. 67 Centennial Bridge
Mississippi River (Iowa / Illinois)
Bridge washing one week. Intermittent non-peak hour lane closures.
June or July 2009  
Mississippi River (Rock Island Arsenal)
Bridge Location Restriction Timeline Status

Government Bridge
Mississippi River (Rock Island Arsenal)
 

Swing span gives right-of-way to river barge traffic.Expect periodic vehicular, bicycle, and pedestrian delays. Commercial river traffic asked to voluntarily delay locking through between 5:30 - 7:00 a.m. and 2:45 - 4:15 p.m.

Summer 2009  

Place an experimental and stress monitoring sensor array on span 2. Bridge closed from 8:00 PM to 5:00 AM.

July 6 – July 17, 2009  

Bridge Washing: Remove accumulated foreign material/wash entire bridge. Power flush bridge deck drains.

Quarterly 2009  
Moline Viaduct
Mississippi River (Rock Island Arsenal)
Clean and seal paved surfaces. Intermittent non-peak hour lane closures.

September 2009  
Bridge Washing: Remove accumulated foreign material/wash entire bridge. Power flush bridge deck drains.

Quarterly 2009  
Repair Structure from Mississippi River Bridge to 7th Avenue. All work done at night time.

June – July 2009 April 3rd letting
Deck replacement with closures planned.

2010  
Rock Island Viaduct
Mississippi River (Rock Island Arsenal)
Railroad Mainline Repair. Rock Island Gate Closure with 2-3 week intermittent lane closures on Ft. Armstrong Avenue and Rock Island Drive.
April 2009
(45 days)
 
Bridge Washing: Remove accumulated foreign material/wash entire bridge. Power flush bridge deck drains.
Quarterly
2009
 

Clean and seal paved surfaces. Intermittent non-peak hour lane closures.

September 2009  
Rock River
Bridge Location Restriction Timeline Status
I-74
Rock River
Bridge washing one week. Intermittent non-peak hour lane closures.

June or July 2009  
I-80
Rock River
No restrictions anticipated.
N/A  
U.S. 67
Rock River
Bridge washing one week. Intermittent non-peak hour lane closures.

June or July 2009  
IL-84
Rock River
No restrictions anticipated.
N/A  
IL-92 Centennial Expressway
Rock River
Bridge washing one week. Intermittent non-peak hour lane closures.
June or July 2009  
27th Street
Rock River
Bridge washing one week.  Intermittent non-peak hour lane closures.
June or July 2009  
West Rock River Bridge
(Veterans Memorial Bridge)
Rock River
Bridge washing one week. Intermittent non-peak hour lane closures.
June or July 2009